Detailed design and negotiations with the Highway Authority relating to proposed frontage footway improvement works required as part of the redevelopment of the adjacent Victoria Mills building.
Full detailed design of s278 Agreement access junction and local highway improvements to serve a 50-berth extension to a static caravan holiday park in north Kent.
Initial review and redesign of approved planning layout for offsite highway widening works required for the expansion of the Gorsley Business Park in Herefordshire followed by the full 3D alignment and construction design of the works, including the preparation of a ‘Technical Approval’ submission.
Sub-consultancy appointment with Norder Design Associates to undertake the design of 8 separate temporary contractor accesses onto the existing public highway. Tasks included undertaking vehicle swept path assessments, 2D layout design and the 3D alignment design/modelling.
Provision of full highway design service for £1.8million s278 Agreement offsite highway improvement scheme required as part of the planning permission for approx 1.8msq.ft B1/B2/B8 development on the edge of Wellingborough.
Pre-planning layout and 3D alignment design for a 3-arm access roundabout north of Stoke on Trent to serve a proposed B2/B8 development of 90,000sqm followed by full 3D modelling and construction design for the s278 Agreement access works and the on-site s7/s38 Agreement on-site road including production of technical approval submission details for both.
Sub-consultancy appointment with BWB Consulting to undertake a full 2D layout review with subsequent 3D alignment design/modelling for an extensive scheme of major offsite highway improvements to serve the 7m sq.ft distribution/warehousing redevelopment of the former Honda works in Swindon.
2D/3D alignment design and preparation of s38 Agreement technical approval details for 150m dual carriageway and 5-arm access roundabout to serve new Designer Outlet village south of Grantham, Lincs.