Sub-consultant appointment with BE Design to undertake the pre-planning 3D alignment design and forward visibility assessment for a 3-arm access roundabout to serve a proposed B2/B8 development of 90,000sqm. Alignment design overcame significant challenges due to creation of new roundabout on an existing road with a gradient of 10%. Appointment then extended to include the full 3D modelling and construction design for the s278 Agreement works and the production of technical approval submission details. Appointment also included the initial alignment and layout design of 1300m on-site single carriageway access road and a 3-arm 40m ICD roundabout and the subsequent preparation of s38 technical approval submission details.