Sub-consultancy appointment with BWB Consulting to provide design support for a £30million design and build highway improvement scheme to replace an existing level crossing on the A605 at Whittlesey with a new overbridge crossing. Extent of works included 1200m of new single carriageway road and 2no 48m ICD roundabouts. 278 Consulting Limited undertook an initial review of the Client’s indicative design for the scheme followed by the full 3D alignment design modelling of the highway works in Civil 3D. Subsequent assistance provided with the preparation of construction details for submission as part of the technical review process.