Updating and completion of historic design for s278 Agreement mitigation works to existing signalised junction required as part of adjacent residential development scheme. Appointment included obtaining a new topo survey, updating the ‘civils’ aspects of the previous design to account for changes to the existing junction and liaison with designer of the replacement traffic signal installation (4Way Consulting Ltd) to progress the scheme through technical approval process and Stage 2 Road Safety Audit.