Highway Design


3D alignment design and preparation of s278 Agreement technical approval submission details for improvements to an existing 6-arm roundabout to create a new access arm into a proposed B8 distribution facility

Read More »

Updating and completion of historic design for s278 Agreement mitigation works to existing signalised junction required as part of adjacent residential development scheme including procurement of traffic signal design, Stage 2 Road safety Audit and progression through to granting of technical approval.

Read More »

2D layout design of s278 Agreement site access roundabout and highway improvements to 3no off-site junctions including M1 J13 to support a planning application for approx 150,000sqm B8 development on land adjacent to the existing Marston Gate distribution park

Read More »

Full 2D and 3D alignment design and preparation of s278 Agreement technical approval submission for 300m road improvement scheme to create new ghost island accesses into two-unit B8 distribution facility for Prologis UK Limited

Read More »

Sub-consultancy appointment to provide design support for a £30million design and build highway improvement scheme to replace an existing level crossing on the A605 at Whittlesey with a new overbridge crossing. Extent of works included approx 1200m of new single carriageway road and 2no 48m ICD roundabouts for which 278 Consulting Limited undertook an initial review of the Client’s indicative design for the scheme and the full 3D alignment design modelling of the highway works

Read More »

Provision of pre-planning highways advice and 2D layout design for the widening of the A508 to create a new ghost-island junction as part of a change-of-use application for the adjacent land to become a Green Burial Meadow. Subsequent detailed design and preparation of full technical approval package for submission to Northants Highways.

Read More »

Pre-planning 3D alignment design and forward visibility assessment for a 3-arm access roundabout to serve a proposed B2/B8 development of 90,000sqm. Subsequent 3D modelling and construction design for the s278 Agreement access works and the on-site s7/s38 Agreement on-site road including production of technical approval submission details for both.

Read More »

Detailed design and preparation of technical approval submission for s278 Agreement works to create a footway extension along the public highway frontage of a development of 2no dwellings. Submission of proposed details to Northants Highways and management of process to obtain their technical approval.

Read More »

Prepare and submit an application to the Department for Transport for the ‘stopping-up’ of part of the public highway as part of the development of a single dwelling. Subsequently appointed to undertake the detailed design of minor s278 Agreement highway improvement works to create a new footway along the frontage of the development and submission of the construction details to Derbyshire County Council for full technical approval.

Read More »